![Initial Installation](https://cdn.treehouseinternetgroup.com/uploads/photo_gallery/medium/500437-a60b70f9f724904adabed343fb6c97b6.jpg?v=1706220873)
Initial Installation
During the job, the client was on-site and everything proceeded smoothly
![Connected to the roof](https://cdn.treehouseinternetgroup.com/uploads/photo_gallery/medium/500438-ccab8f1e363be5572e6843f114a955b6.jpg?v=1706220873)
Connected to the roof
The U-tube readings came back at 1, indicating the need for attention.
![Another layer of roof](https://cdn.treehouseinternetgroup.com/uploads/photo_gallery/medium/500439-278a1281ff72f63960f74b8af3d02d3b.jpg?v=1706220873)
Another layer of roof
The crew cut a hole in the roof for further investigation, revealing an additional layer of roofing.
![Rerouted the pipe](https://cdn.treehouseinternetgroup.com/uploads/photo_gallery/medium/500440-ccbb3e052fbe38244bbde23b6bfb6686.jpg?v=1706220873)
Rerouted the pipe
We had to reroute the pipe above the garage to ensure proper installation.